Completed Parc Dewi Sant NHS rooftop solar installation, Carmarthen

Track record

Case studies

A selection of recent commercial and residential solar and electrical projects delivered across South Wales.

Featured projects
6
Total case studies
14
Largest system
637 kW
Accreditation
NICEIC · MCS
Featured projects

Flagship installations

Recent flagship schemes showing the full FLD capability - defence manufacturing, NHS healthcare, marina residential, leisure and public-sector modular.

637 kW Rooftop Solar: Irvin-GQ, South Wales
Defence and aerospace manufacturing

637 kW Rooftop Solar: Irvin-GQ, South Wales

Llangeinor, Bridgend · 637 kW

At peak generation the building runs fully off-grid against a premises consumption of 1,076,078 kWh per year. Annual CO2 saving of 441.632 tonnes - 14,800 trees-equivalent. Payback 3 years, lifetime ROI £3 million. The client has since commissioned FLD to scope battery storage addition to capture afternoon surplus against overnight site load, and is progressing with Scope 3 reporting integration into their MoD supply-chain disclosures.

£525,000 Read case study
Parc Dewi Sant - 152 kW NHS healthcare campus solar, Carmarthen
NHS healthcare estate

Parc Dewi Sant

Carmarthen · 152 kW

Since going online in 2022 the system has produced 477 MWh of clean energy and contributed 253,869 kg of CO2 reduction. Lifetime ROI approximately £1 million against a £252,750 capex. The monitoring output is feeding into Hywel Dda's estate carbon reporting against NHS Wales decarbonisation targets, and FLD is in discussion with the board on follow-on scope for additional Hywel Dda campuses.

£252,750 Read case study
Cambrian Place - 33 kW Viridian in-roof solar, Swansea Marina
Multi-occupancy residential

Cambrian Place

Swansea Marina, Swansea · 33 kW

A 33 kW renewable energy source quietly integrated into the Swansea Marina roofscape, supplying 32 residential flats, meaningfully reducing shared-services energy costs and delivering long-term carbon-footprint reduction for the development. The Viridian in-roof finish has been well-received by residents and the managing agent, and FLD has since been contacted on similar multi-occupancy marina-district schemes.

commercial in confidence Read case study
Rainbow Leisure Centre - 337 kW SolarEdge commercial solar, Middlesbrough
Leisure, sport and hospitality

Rainbow Leisure Centre

Middlesbrough · 337 kW

Estimated annual solar production of 246.17 MWh. Annual CO2 savings of 47.61 tonnes - equivalent to 2,186 trees planted. Estimated lifetime ROI approximately £1 million against a 3-year estimated payback. The centre stayed open for members throughout the installation.

£252,750 Read case study
Swansea Recycling Plant - 50 kW rooftop solar on live-operation modular sales shop
Public sector and circular economy

Swansea Recycling Plant

Swansea · 50 kW

A 50 kW rooftop solar array commissioned onto live modular casings without stopping waste recycling operations. Annual generation of 48.06 MWh delivers 10.74 tonnes of CO2 savings per year - equivalent to 493 trees planted. Payback 3.5 years against a £45,000 capital cost, with a projected lifetime ROI of £300,000.

£45,000 Read case study
Princess of Wales Hospital - 236.50 kWp SolarEdge NHS rooftop solar, Bridgend
NHS healthcare estate

Princess of Wales Hospital

Bridgend · 236.50 kWp

Estimated annual solar production of 218.44 MWh. Annual CO2 savings of 42.24 tonnes - equivalent to 1,940 trees planted. Estimated lifetime ROI approximately £1.2 million against a 3.5-year estimated payback on the £227,000 capex. The system is now feeding the Cwm Taf Morgannwg estate carbon reporting against NHS Wales net-zero targets.

£227,000 Read case study
More projects

Further case studies

Public sector and secure building

Cardiff Crown Courts entrance and foyer refurbishment

Cardiff
Project value

approximately £50,000

Refurbishment completed on programme, no court sittings disrupted, HMCTS acceptance on first inspection. Warranted by NICEIC insurance-backed guarantee.

Read case study
Healthcare and supported living

Ty-Croes Assisted Living Centre, Llanybyther

Llanybyther
Project value

approximately £80,000

The project has been commissioned.

Read case study
Residential new-build

Two luxury five-bed detached houses, Bridgend

Bridgend
Project value

approximately £65,000 (combined)

Both houses sold on completion. The developer has booked FLD for the next two phases.

Read case study
Agriculture and dairy

75 kWp agricultural solar, Pembrokeshire dairy farm

75 kWp
Haverfordwest
Project value

approximately £71,000 before Farming Connect grant

Farming Connect grant of £28,400 (40% of eligible costs) secured. Net capex after grant: £42,600. Post-grant AIA payback: 1.9 years. The battery has already sustained refrigeration through two winter grid interruptions. The client has enquired about a second array on the grain store.

Read case study
Education and public sector

100 kWp school solar, Swansea secondary school

100 kWp
Swansea
Project value

approximately £88,000 (Salix-funded, zero capital cost to school)

Salix Wales interest-free loan of £88,000 approved. Installation completed in 5 days during school summer holiday. First-term monitoring shows 89% term-time self-consumption - above the 82% modelled. The reception display has been used in 14 science and geography lessons. The school's energy manager has submitted a second application for the sports hall roof.

Read case study
Sports and leisure facility

LED Lighting Upgrade: Swansea Bowls Centre

Swansea

The upgrade cut the hall's annual lighting electricity consumption by 50%, with a payback period of 2.75 years on the works and an associated carbon saving of 5,943 kg CO2 per year. The centre keeps the light quality it needs for play, sheds the ongoing fluorescent lamp-and-ballast maintenance, and gains dimming control it never had before.

Read case study
Commercial solar operations & maintenance

257 kW Solar Maintenance & Panel Clean

257 kW
South Wales

The array was returned to clean, fully-inspected condition, restoring the light reaching every cell and protecting the client's return on the asset. With the system back on a documented maintenance footing, generation is no longer being quietly lost to soiling, and the client has the inspection record needed to keep warranty and insurance conditions satisfied. FLD supplies before-and-after photography as part of every maintenance visit.

Read case study
Commercial solar operations & maintenance

Thermography Finds a Solar Fire Risk

South Wales

A developing fire risk was found and eliminated before it could cause damage or downtime, and the array was returned to safe, fully-documented working order with the thermal images kept as part of the maintenance record. It is a direct illustration of why FLD builds infrared inspection into its solar maintenance: the problems that threaten an asset most are the ones you cannot see without the right equipment.

Read case study

Ready for a fixed-price quotation?

Speak to Paul directly. Most quotes turn around within five working days of a site survey.

Trusted by NHS care providers, HMCTS and private developers across South Wales.

Request a callback