Domestic electrical scope
- Full and partial rewires
- 18th Edition Amendment 2 consumer unit upgrades
- EICR for sale, mortgage, landlord or peace of mind
- EV charger installation (OCPP, tethered or untethered, 7 kW AC)
- Kitchen and bathroom wiring with correct zone classification
- Smart home integration (KNX, smart lighting)
- Fault finding and emergency call-out
- CCTV, intercom and access control for residential properties
What NICEIC Approved means for you
Every installation is signed off by a NICEIC-registered engineer and comes with an insurance-backed warranty. You get a Part P compliance certificate for notifiable work and a properly-filed Electrical Installation Certificate.
Reference project
A pair of luxury five-bedroom detached houses in Bridgend, combined value approximately £65,000. Scope included full first and second fix, KNX-compatible home automation, Cat6a data to every habitable room, 4K CCTV cabling, fire alarm to BS 5839 Grade D for dwellings, and NICEIC Domestic Installer Scheme sign-off with Part P certificates issued to both buyers.
Our process
- 1Site survey
A named FLD engineer visits your site, measures the roof or installation zone, inspects the incoming supply and verifies load, structural integrity and orientation. For commercial sites we run a full discovery including half-hourly consumption data where available.
- 2Design and proposal
We produce a scaled layout, generation model using PVGIS data, financial model with simple and post-tax payback, DNO G99 or G98 notification pack where relevant, and a fixed-price quotation. Every proposal names the exact panels, inverters and mounting system.
- 3DNO and planning
We handle NGED G99 Type A applications for commercial systems, G98 notifications for domestic, and any permitted development confirmation or full planning submissions required for listed buildings or conservation areas.
- 4Install and commission
FLD directly-employed engineers install under a single NICEIC Approved Contractor sign-off. Commissioning includes BS 7671 testing, SolarEdge monitoring portal setup, MCS certification where applicable, and handover of all documentation.
- 5Aftercare
Insurance-backed NICEIC warranty, 25-to-30-year panel performance warranty from the tier-1 manufacturer, 12-year SolarEdge inverter warranty, and ongoing O and M support including remote performance monitoring.
Standards we work to
- BS 7671
- Part P
- BS 5839 Part 6