Skip to content

Services

Industrial Electrical Works in South Wales

NICEIC Approved Contractor industrial electrical works across the Swansea Valley, Port Talbot, Milford Haven, Pembroke and the wider South Wales industrial corridor.

Industrial scope

FLD delivers full-scope industrial electrical contracting under a single NICEIC Approved Contractor sign-off. Typical work includes:

  • Low-voltage distribution up to 1,000 A
  • SCADA and Building Management System containment and terminations
  • Motor control centres and variable-speed drives
  • Hazardous-area installation to BS EN 60079 where applicable
  • Structured cabling backbones integrated with process networks
  • Fire alarm to BS 5839 Part 1 integrated with plant shutdown logic
  • Emergency lighting to BS 5266 Part 1
  • High-bay LED retrofits
  • Containment, cable tray, basket, trunking and ladder rack to IET standards

Sector coverage

Tata Steel Port Talbot supply chain, Clydach Mond nickel refinery, Milford Haven energy cluster including Valero Pembroke, Dragon LNG and South Hook LNG, Sony UK Technology Centre Pencoed, INEOS Automotive Bridgend, and General Dynamics UK Oakdale.

Accreditations that matter

  • NICEIC Approved Contractor (commercial and industrial scope)
  • ConstructionLine (tier-1 main contractor pre-qualification)
  • SMAS Worksafe (CDM and SSIP)
  • Directly-employed engineering team, no sub-contracted labour on the live works

How we price

Fixed-price tenders against full drawings and specifications, or schedule of rates on a measured-term framework. We hold contracts on frameworks with main-contractor repeat clients across the region.

Our process

  1. 1
    Site survey

    A named FLD engineer visits your site, measures the roof or installation zone, inspects the incoming supply and verifies load, structural integrity and orientation. For commercial sites we run a full discovery including half-hourly consumption data where available.

  2. 2
    Design and proposal

    We produce a scaled layout, generation model using PVGIS data, financial model with simple and post-tax payback, DNO G99 or G98 notification pack where relevant, and a fixed-price quotation. Every proposal names the exact panels, inverters and mounting system.

  3. 3
    DNO and planning

    We handle NGED G99 Type A applications for commercial systems, G98 notifications for domestic, and any permitted development confirmation or full planning submissions required for listed buildings or conservation areas.

  4. 4
    Install and commission

    FLD directly-employed engineers install under a single NICEIC Approved Contractor sign-off. Commissioning includes BS 7671 testing, SolarEdge monitoring portal setup, MCS certification where applicable, and handover of all documentation.

  5. 5
    Aftercare

    Insurance-backed NICEIC warranty, 25-to-30-year panel performance warranty from the tier-1 manufacturer, 12-year SolarEdge inverter warranty, and ongoing O and M support including remote performance monitoring.

Commercial solar inverters with cable management in dedicated plant room

Plant room commissioning

415V HV distribution board with inverter circuit breakers, commercial installation

415V distribution board

Recent FLD installation — view all project photos

Standards we work to

  • BS 7671
  • BS EN 60079
  • BS 5839 Part 1
  • BS 5266 Part 1
  • BS EN 50173
FAQ

Frequently asked questions

Yes. Typical FLD scope covers LV distribution, SCADA and BMS containment, lighting, fire alarm, CCTV, access control, intercom and data, all under a single NICEIC Approved Contractor sign-off. Reference project: Cardiff Crown Courts refurbishment, approximately £50,000.
NICEIC is the UK's most recognised certification body for electrical installers. An NICEIC Approved Contractor has been audited on competence, quality management and BS 7671 compliance. It gives you an insurance-backed warranty on the installation work we sign off, and meets the Competent Person scheme requirements for Building Regulations Part P.
ConstructionLine is a UK pre-qualification scheme used by main contractors and public bodies. FLD holds ConstructionLine membership, meaning we have been vetted on health and safety, insurance, financial stability and references. That cuts procurement friction for tier-1 main contractors and for public-sector tenders.
BS 7671 recommends a maximum of five years for most commercial premises. Industrial sites are typically every three years. Some high-risk environments such as petrol stations and healthcare settings are annual. Welsh landlords have additional obligations under the Electrical Safety Standards in the Private Rented Sector (Wales) Regulations and under the Welsh Housing Quality Standard 2023.
Structured cabling is the standardised low-voltage data, telecoms and power infrastructure of a building, specified to TIA-568 and BS EN 50173. We design, install and certify Cat6, Cat6a and Cat7 copper networks and OM3, OM4 or OS2 singlemode fibre backbones for offices, factories and data rooms.

Ready for a fixed-price quotation?

Speak to Paul directly. Most quotes turn around within five working days of a site survey.

Trusted by NHS care providers, HMCTS and private developers across South Wales.