Commercial and domestic solar PV installation across Neath and the wider Neath Port Talbot CBC area. NICEIC Approved, MCS certified, 35 years trading.

Solar yield
950 kWh/kWp
Postcodes
SA10, SA11
Planning authority
Neath Port Talbot CBC
Drive from HQ
8 mi · 15 min

Why solar works in Neath

Neath carries a town population of 50,658 across the SA10 and SA11 postcodes and falls inside Neath Port Talbot County Borough Council. The town's largest institutional employer is Neath Port Talbot Hospital, with the local council, the University of South Wales Hydrogen Centre at Baglan, and a cluster of manufacturing SMEs completing the commercial base.

PVGIS modelling for SA10 returns typical annual yields of around 950 kWh per kWp installed for a well-oriented rooftop array at 30 to 35 degrees pitch. In practice that means a 4 kWp domestic array generates roughly 3,800 kWh per year, and a 50 kWp commercial rooftop around 47,500 kWh.

Commercial solar in Neath

Densest light-industrial estate stock within 10 miles of Swansea. For commercial operators, the combination of a predictable 950 kWh/kWp yield, current commercial electricity prices at 28 to 32p per kWh, and the Annual Investment Allowance tax treatment means simple payback on a well-sized Neath commercial array typically lands between 3.5 and 6 years.

Worked example: 100 kWp commercial installation

Typical Neath commercial rooftops

We have installed commercial solar across Neath Abbey Business Park, Baglan Energy Park, Milland Road Industrial Estate in Neath. Typical system sizes range from 30 kWp on smaller trade units to 500 kWp-plus on larger warehouse and factory roofs.

Domestic solar in Neath

For Neath homeowners, a typical domestic installation is a 4 to 5 kWp array paired with a 5 to 10 kWh battery. At 950 kWh/kWp, a 4 kWp system generates around 3,800 kWh in year one, which covers a meaningful share of a three or four-bedroom household's annual consumption once battery storage smooths the time-of-use mismatch. Payback typically lands at 7 to 10 years at current pricing and Smart Export Guarantee tariffs.

Planning and grid connection

The planning authority for Neath is Neath Port Talbot CBC. Rooftop solar PV on commercial buildings almost always falls within permitted development under the Town and Country Planning (General Permitted Development) (Wales) Order, subject to the usual 200 mm projection limit and non-listed, non-scheduled-monument conditions. Properties inside a conservation area will typically require full planning permission; we handle the application end-to-end.

For grid connection, systems above 3.68 kW per phase require a G99 application to the DNO. Typical approval timelines are 6 to 8 weeks for Type A (up to 1 MW), which we lodge concurrently with design and procurement so they do not sit on the critical path.

Why FLD for your Neath installation

Start the conversation

If you own a commercial rooftop or a domestic property in Neath (SA10, SA11) and want a realistic assessment against your actual consumption data, call Paul direct on 01792 680611 or visit our Neath location page for full local detail.

FAQ

Frequently asked questions

At 30p/kWh grid electricity, a 100 kWp system generating 95,000 kWh/yr with 70% self-consumption delivers around £24,000 of year-one benefit against c. £85,000 capex, a 3.5-year simple payback. Under Annual Investment Allowance first-year 100% relief, post-tax payback is closer to 2.6 years. South Wales yields 940 to 985 kWh/kWp/year depending on postcode, comfortably enough for commercial solar to be cashflow positive from month one with a PPA.
A Power Purchase Agreement is a financing arrangement where we fund and install a rooftop solar system at no upfront cost. Your business buys the electricity the system generates at a fixed, RPI-indexed rate that is lower than your grid tariff. The PPA typically runs 10 to 25 years. At the end you can extend, buy out at a pre-agreed residual value, or have the system removed. It suits businesses that want immediate savings without capital outlay and that are credit-worthy with a stable site.
Yes, depending on organisation type. Welsh SMEs and public bodies can access the Welsh Government Energy Service, Ynni Cymru Capital Grants (approximately £10 m in 2026-27, £25,000 to £1 m per project) and Development Bank of Wales Green Business Loans. Welsh public-sector bodies use Salix Wales Funding Programme rather than the English Public Sector Decarbonisation Scheme. Farms may be eligible under Farming Connect. Always check current-year terms before committing.
Once DNO G99 connection approval is in place and materials are on site, a typical 100 kWp rooftop install takes 5 to 8 working days. The critical-path item is usually the NGED Type A connection approval, which is 3 to 6 months in South Wales in 2026. We manage that application as part of our scope.