Commercial and domestic solar PV installation across Llanelli and the wider Carmarthenshire CC area. NICEIC Approved, MCS certified, 35 years trading.

Solar yield
960 kWh/kWp
Postcodes
SA14, SA15
Planning authority
Carmarthenshire CC
Drive from HQ
11 mi · 20 min

Why solar works in Llanelli

Llanelli is the largest town in Carmarthenshire, with a population of approximately 45,000 split across the SA14 and SA15 postcodes. Employment anchors include Prince Philip Hospital under Hywel Dda University Health Board, the independent television production house Tinopolis, the Felinfoel Brewery (founded 1878 and notable as both the oldest brewery in Wales and the first brewery in the world to can beer, which it did in 1935), and Tarmac Temple Works.

PVGIS modelling for SA14 returns typical annual yields of around 960 kWh per kWp installed for a well-oriented rooftop array at 30 to 35 degrees pitch. In practice that means a 4 kWp domestic array generates roughly 3,840 kWh per year, and a 50 kWp commercial rooftop around 48,000 kWh.

Commercial solar in Llanelli

SA14 is the densest commercial industrial sub-district in Carmarthenshire. For commercial operators, the combination of a predictable 960 kWh/kWp yield, current commercial electricity prices at 28 to 32p per kWh, and the Annual Investment Allowance tax treatment means simple payback on a well-sized Llanelli commercial array typically lands between 3.5 and 6 years.

Worked example: 100 kWp commercial installation

Typical Llanelli commercial rooftops

We have installed commercial solar across Dafen Industrial Estate, Trostre Industrial Park, Stradey Business Centre and other industrial estates in Llanelli. Typical system sizes range from 30 kWp on smaller trade units to 500 kWp-plus on larger warehouse and factory roofs.

Domestic solar in Llanelli

For Llanelli homeowners, a typical domestic installation is a 4 to 5 kWp array paired with a 5 to 10 kWh battery. At 960 kWh/kWp, a 4 kWp system generates around 3,840 kWh in year one, which covers a meaningful share of a three or four-bedroom household's annual consumption once battery storage smooths the time-of-use mismatch. Payback typically lands at 7 to 10 years at current pricing and Smart Export Guarantee tariffs.

Planning and grid connection

The planning authority for Llanelli is Carmarthenshire CC. Rooftop solar PV on commercial buildings almost always falls within permitted development under the Town and Country Planning (General Permitted Development) (Wales) Order, subject to the usual 200 mm projection limit and non-listed, non-scheduled-monument conditions. Properties inside a conservation area will typically require full planning permission; we handle the application end-to-end.

For grid connection, systems above 3.68 kW per phase require a G99 application to the DNO. Typical approval timelines are 6 to 8 weeks for Type A (up to 1 MW), which we lodge concurrently with design and procurement so they do not sit on the critical path.

Why FLD for your Llanelli installation

Start the conversation

If you own a commercial rooftop or a domestic property in Llanelli (SA14, SA15) and want a realistic assessment against your actual consumption data, call Paul direct on 01792 680611 or visit our Llanelli location page for full local detail.

FAQ

Frequently asked questions

At 30p/kWh grid electricity, a 100 kWp system generating 95,000 kWh/yr with 70% self-consumption delivers around £24,000 of year-one benefit against c. £85,000 capex, a 3.5-year simple payback. Under Annual Investment Allowance first-year 100% relief, post-tax payback is closer to 2.6 years. South Wales yields 940 to 985 kWh/kWp/year depending on postcode, comfortably enough for commercial solar to be cashflow positive from month one with a PPA.
A Power Purchase Agreement is a financing arrangement where we fund and install a rooftop solar system at no upfront cost. Your business buys the electricity the system generates at a fixed, RPI-indexed rate that is lower than your grid tariff. The PPA typically runs 10 to 25 years. At the end you can extend, buy out at a pre-agreed residual value, or have the system removed. It suits businesses that want immediate savings without capital outlay and that are credit-worthy with a stable site.
Once DNO G99 connection approval is in place and materials are on site, a typical 100 kWp rooftop install takes 5 to 8 working days. The critical-path item is usually the NGED Type A connection approval, which is 3 to 6 months in South Wales in 2026. We manage that application as part of our scope.
Yes. Typical FLD scope covers LV distribution, SCADA and BMS containment, lighting, fire alarm, CCTV, access control, intercom and data, all under a single NICEIC Approved Contractor sign-off. Reference project: Cardiff Crown Courts refurbishment, approximately £50,000.

Ready for a fixed-price quotation?

Speak to Paul directly. Most quotes turn around within five working days of a site survey.